PRODUCTS

Manufacturing and Installation of Cable Trays to be Used in Bridges and Culverts

0.00 Piece

198 meters of one piece bridge channel manufacturing (SUMUCAK Station) 20,000 meters of total bridge (stone bridge - iron suspension bridge - culvert) cable channel manufacturing

78.000 kg bridge console manufacturing (special weldless console manufacturing for each bridge)